Texas - Mapping Status
Please visit www.riskmap6.com for an interactive mapping viewer of the current Effective FIRM data compared to the
recent Preliminary DFIRM data released for your county.
FEMA's website contains Flood Hazard Determination Notices for the State of Texas.

Bosque County
    Meeting Dates

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Brown County
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 12.21.12
    Appeals and Comments Period: 07.31.14 - 10.28.14

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Collin County
Preliminary Interactive Flood Map Index
Flood Insurance Study (Vol. 1)
Flood Insurance Study (Vol. 2)
Flood Insurance Study (Vol. 3)
Flood Insurance Study (Vol. 4)
Data Acquisition Newsletter (Sep. 24, 2010)
H&H Meeting Minutes (Aug. 3, 2010)
H&H Newsletter (Sep. 24, 2010)
Kickoff Meeting Presentation (Mar. 24, 2010)
Kickoff Meeting Minutes (Mar. 24, 2010)
Kickoff Newsletter (Mar. 24, 2010)
Meeting Presentation
Meeting Minutes
OTS Presentation (Jul. 26, 2011)
OTS Minutes (Jul. 26, 2011)
DFIRM OTS Presentation (Oct. 26, 2011)
DFIRM OTS Minutes (Oct. 26, 2011)
DFIRM Newsletter (Oct. 26, 2011)

Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (July 31, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
Progress Report (October 30, 2015)
Progress Report (November 30, 2015)

    Meeting Dates
    Initial Coordination Meeting: 10.27.09 @ 8:30a.m.
    Scoping Kickoff Meeting: 03.24.10 @ 10a.m.

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 12.30.11
    Appeals and Comments Period: 09.21.12 - 12.19.12

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Dallas County
Kickoff Meeting Presentation (Apr. 8, 2010)
Kickoff Meeting Minutes (Apr. 8, 2010)
Kickoff Newsletter (Apr. 8, 2010)
Meeting Presentation
Meeting Minutes

Progress Report (Oct. 31, 2009)
Progress Report (Nov. 30, 2009)
Progress Report (Dec. 31, 2009)
Progress Report (Jan. 31, 2010)
Progress Report (Feb. 28, 2010)
Progress Report (Apr. 30, 2010)
Progress Report (May 28, 2010)
Progress Report (Jun. 25, 2010)
Progress Report (Jul. 30, 2010)
Progress Report (Aug. 31, 2010)
Progress Report (Sep. 30, 2010)
Progress Report (Oct. 31, 2010)
Progress Report (Dec. 31, 2010)
Progress Report (Jan. 31, 2011)
Progress Report (Feb. 28, 2011)
Progress Report (Mar. 31, 2011)
Progress Report (Apr. 30, 2011)
Progress Report (May 31, 2011)
Progress Report (Jun. 30, 2011)
Progress Report (Jul. 31, 2011)
Progress Report (Aug. 31, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 30, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
    Meeting Dates
    Initial Coordination Meeting: 10.26.09 @ 8:30a.m.
    Kickoff Meeting: 04.08.10 @ 8:30a.m.

    Digital Flood Insurance Rate Map (DFIRM) Dates

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

El Paso County
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Gregg County
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 07.17.11
    Appeals and Comments Period: 08.28.13 - 11.25.13
    LFD Date: 03.03.14
    Effective Date: 09.03.14

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Harris County
Please visit http://www.riskmap6.com/TX/Harris/ for an interactive mapping viewer of the current Effective FIRM data compared to the recent Preliminary DFIRM data released for your county.
Preliminary Interactive Flood Map Index
Flood Insurance Study
Kickoff Meeting Presentation (Apr. 15, 2010)
Kickoff Meeting Minutes (Apr. 15, 2010)
OTS Meeting Minutes (Jun. 22, 2010)
OTS Meeting Minutes with HCFDC (Jun. 23, 2010)
CCO Meeting Minutes (Nov. 10, 2010)

Progress Report (Sep. 30, 2010)
Progress Report (Oct. 31, 2010)
Progress Report (Nov. 30, 2010)
Progress Report (Dec. 31, 2010)
Progress Report (Jan. 31, 2011)
Progress Report (Feb. 28, 2011)
Progress Report (Mar. 31, 2011)
Progress Report (Apr. 30, 2011)
Progress Report (May 31, 2011)
Progress Report (Jun. 30, 2011)
Progress Report (Aug. 31, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
    Meeting Dates
    Kickoff Meeting: 04.15.10 @ 10a.m.
    Over the Shoulder (OTS) Meeting: 06.11.10
    Community Consultation Officers (CCO) Meeting: 11.10.10

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 09.30.10
    Appeals and Comments Period: 01.18.11 - 04.17.11
    FY11 PMR Effective Date: 06.09.14

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Harrison County
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 02.23.11
    Appeals and Comments Period: 08.28.13 - 11.25.13
    LFD Date: 03.03.14
    Effective Date: 09.03.14

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Hays County
    Meeting Dates
    Initial Coordination Meeting: 10.28.09 @ 1p.m.
    Kickoff Meeting: 04.16.10 @ 9a.m.

    Digital Flood Insurance Rate Map (DFIRM) Dates

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Lee County
    Meeting Dates
    Initial Coordination Meeting: 10.29.09 @ 8:30a.m.
    Kickoff Meeting: 06.02.10

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 03.21.12
    Appeals and Comments Period: 09.19.12 - 12.17.12
    Effective Date: 04.16.14


    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Leon County
    Meeting Dates
    Initial Coordination Meeting: 10.30.09 @ 8:30a.m.
    Kickoff Meeting: 05.27.10

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 02.28.12
    Appeals and Comments Period: 08.08.12 - 11.05.12
    Effective Map Date: 11.20.13

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Llano County
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 09.30.13

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com


Lubbock County
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release:

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com


Tarrant County
Data Acquisition Newsletter (Sep. 24, 2010)
H&H Meeting Minutes (Aug. 3, 2010)
H&H Newsletter (Sep. 24, 2010)
Kickoff Meeting Presentation (May 7, 2010)
Kickoff Meeting Minutes (May 7, 2010)
Kickoff Newsletter (May 7, 2010)
Meeting Presentation
Meeting Minutes

Progress Report (Aug. 31, 2012)
Progress Report (September 30, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 30, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (July 31, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
Progress Report (October 30, 2015)
Progress Report (November 30, 2015)
    Meeting Dates
    Initial Coordination Meeting: 10.27.09 @ 2p.m.
    Kickoff Meeting: 05.07.10

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 08.31.12
    Appeals and Comments Period: 02.20.13 - 05.20.13

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Travis County
    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 05.02.12
    Appeals and Comments Period: 01.17.13 - 04.16.13
    Effective Date: 08.18.14

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Wharton County
    Meeting Dates
    Initial Coordination Meeting:
    Kickoff Meeting:

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Williamson County
    Meeting Dates
    Initial Coordination Meeting: 10.28.09 @ 8:30a.m.
    Kickoff Meeting: 04.15.10 @ 9a.m.

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Coastal Texas
For more information specific to Texas Coastal county flood studies, please visit the TXCHART site at http://www.txchart.com.

TXCHART Progress Reports
The following Coastal Counties of Texas will be included in an in-depth Outreach Project. The website for these counties is under development and will be online soon.

Aransas County
Meet & Greet Presentation

Progress Report (Jan. 28, 2011)
Progress Report (Feb. 25, 2011)
Progress Report (Mar. 25, 2011)
Progress Report (Apr. 29, 2011)
Progress Report (May 27, 2011)
Progress Report (Jun. 29, 2011)
Progress Report (Aug. 31, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report( (Feb. 28, 2013)
Progress Report( (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (July 31, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
Progress Report (October 30, 2015)
Progress Report (November 30, 2015)
Progress Report (December 31, 2015) NEW!

LAMP Progress Report (Nov. 30, 2014)
LAMP Progress Report (Dec. 31, 2014)
LAMP Progress Report (Jan. 31, 2015)
LAMP Progress Report (Feb. 28, 2015)
LAMP Progress Report (Mar. 31, 2015)
LAMP Progress Report (Apr. 30, 2015)
LAMP Progress Report (May 31, 2015)
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 08.29.14

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Brazoria County
Meet & Greet Presentation

Progress Report (Jan. 28, 2011)
Progress Report (Feb. 25, 2011)
Progress Report (Mar. 25, 2011)
Progress Report (Apr. 29, 2011)
Progress Report (May 27, 2011)
Progress Report (Jun. 29, 2011)
Progress Report (Jul. 29, 2011)
Progress Report (Aug. 31, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (July 31, 2015)
Progress Report (September 30, 2015)
Progress Report (November 30, 2015)

LAMP Progress Report (Dec. 31, 2013)
LAMP Progress Report (Jan. 31, 2014)
LAMP Progress Report (Feb. 28, 2014)
LAMP Progress Report (Mar. 31, 2014)
LAMP Progress Report (Apr. 30, 2014)
LAMP Progress Report (May 31, 2014)
LAMP Progress Report (Jun. 30, 2014)
LAMP Progress Report (Jul. 31, 2014)
LAMP Progress Report (Aug. 31, 2014)
LAMP Progress Report (Sep. 30, 2014)
LAMP Progress Report (Oct. 31, 2014)
LAMP Progress Report (Nov. 30, 2014)
LAMP Progress Report (Dec. 31, 2014)
LAMP Progress Report (Feb. 28, 2015)
LAMP Progress Report (Mar. 31, 2015)
LAMP Progress Report (Apr. 30, 2015)
LAMP Progress Report (May 31, 2015)
LAMP Progress Report (June 30, 2015)
LAMP Progress Report (July 31, 2015)
LAMP Progress Report (September 30, 2015)
    Meeting Dates

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com
Calhoun County
Meet & Greet Presentation

Progress Report (Jan. 28, 2011)
Progress Report (Feb. 25, 2011)
Progress Report (Mar. 25, 2011)
Progress Report (Apr. 29, 2011)
Progress Report (May 27, 2011)
Progress Report (Jun. 29, 2011)
Progress Report (Jul. 29, 2011)
Progress Report (Aug. 31, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (July 31, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 11.01.12
    Appeals and Comments Period: 10.23.13 - 01.20.14
    LFD Date: 04.16.14
    Effective Date: 10.16.14

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com
Cameron County
Meet & Greet Presentation

Progress Report (Jan. 31, 2011)
Progress Report (Feb. 28, 2011)
Progress Report (Mar. 31, 2011)
Progress Report (Apr. 30, 2011)
Progress Report (May 31, 2011)
Progress Report (Jun. 30, 2011)
Progress Report (Jul. 31, 2011)
Progress Report (Aug. 31, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 30, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (July 31, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
Progress Report (October 30, 2015)
Progress Report (November 30, 2015)
Progress Report (December 31, 2015) NEW!
    Meeting Dates

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com
Chambers County
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 01.31.13
    Appeals and Comments Period: 03.12.14 - 06.09.14

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Galveston County
Meet & Greet Presentation

Progress Report (Jan. 31, 2011)
Progress Report (Feb. 28, 2011)
Progress Report (Mar. 31, 2011)
Progress Report (May 2, 2011)
Progress Report (Jun. 1, 2011)
Progress Report (Jul. 1, 2011)
Progress Report (Aug. 1, 2011)
Progress Report (Sep. 1, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
Progress Report (November 30, 2015)
Progress Report (December 31, 2015)NEW!
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 09.27.12
    Appeals and Comments Period: 06.27.13 - 09.24.13

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com
Harris County
Meet & Greet Presentation

Progress Report (Jan. 31, 2011)
Progress Report (Feb. 28, 2011)
Progress Report (Mar. 31, 2011)
Progress Report (May 2, 2011)
Progress Report (Jun. 1, 2011)
Progress Report (Jul. 1, 2011)
Progress Report (Aug. 1, 2011)
Progress Report (Sep. 1, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 31, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
Progress Report (December 31, 2015)NEW!
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 07.31.12
    Appeals and Comments Period: 11.14.13 - 02.11.14

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com
Jackson County
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 12.01.12
    Appeals and Comments Period: 06.26.13 - 09.23.13
    LFD Date: 03.17.2014
    Effective Date: 09.17.14

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com
Jefferson County
Meet & Greet Presentation

Progress Report (Jan. 31, 2011)
Progress Report (Feb. 28, 2011)
Progress Report (Mar. 31, 2011)
Progress Report (May 2, 2011)
Progress Report (Jun. 1, 2011)
Progress Report (Jul. 1, 2011)
Progress Report (Aug. 1, 2011)
Progress Report (Sep. 1, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (July 31, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
Progress Report (October 30, 2015)
Progress Report (December 31, 2015)NEW!
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 08.30.12

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com
Kleberg County
Meet & Greet Presentation

Progress Report (Jan. 31, 2011)
Progress Report (Feb. 28, 2011)
Progress Report (Mar. 31, 2011)
Progress Report (May 2, 2011)
Progress Report (Jun. 1, 2011)
Progress Report (Jul. 1, 2011)
Progress Report (Aug. 1, 2011)
Progress Report (Sep. 1, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (August 30, 2015)
Progress Report (September 30, 2015)
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 08.06.12
    Appeals and Comments Period: 02.27.13 - 05.27.13

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com
Matagorda County
Meet & Greet Presentation

Progress Report (Jan. 28, 2011)
Progress Report (Feb. 25, 2011)
Progress Report (Mar. 25, 2011)
Progress Report (Apr. 29, 2011)
Progress Report (May 27, 2011)
Progress Report (Jun. 29, 2011)
Progress Report (Jul. 29, 2011)
Progress Report (Aug. 31, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (June 30, 2015)
Progress Report (September 30, 2015)
Progress Report (November 30, 2015)
Progress Report (December 31, 2015) NEW!
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 09.13.12
    Appeals and Comments Period: 06.26.13 - 09.23.13

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com
Nueces County
Meet & Greet Presentation

Progress Report (Jan. 31, 2011)
Progress Report (Feb. 28, 2011)
Progress Report (Mar. 31, 2011)
Progress Report (Apr. 30, 2011)
Progress Report (May 31, 2011)
Progress Report (Jun. 30, 2011)
Progress Report (Jul. 31, 2011)
Progress Report (Aug. 31, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (July 31, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
Progress Report (October 30, 2015)
Progress Report (December 31, 2015) NEW!

LAMP Progress Report (Oct. 31, 2013)
LAMP Progress Report (Nov. 30, 2013)
LAMP Progress Report (Dec. 31, 2013)
LAMP Progress Report (Feb. 28, 2014)
LAMP Progress Report (Mar. 31, 2014)
LAMP Progress Report (Apr. 30, 2014)
LAMP Progress Report (May 31, 2014)
LAMP Progress Report (Jun. 30, 2014)
LAMP Progress Report (Jul. 31, 2014)
LAMP Progress Report (Aug. 31, 2014)
LAMP Progress Report (Sep. 30, 2014)
LAMP Progress Report (Oct. 31, 2014)
LAMP Progress Report (Nov. 30, 2014)
LAMP Progress Report (Dec. 31, 2014)
LAMP Progress Report (Jan. 31, 2015)
LAMP Progress Report (Feb. 28, 2015)
LAMP Progress Report (Mar. 31, 2015)
LAMP Progress Report (Apr. 30, 2015)
LAMP Progress Report (May 31, 2015)
LAMP Progress Report (June 30, 2015)
LAMP Progress Report (July 31, 2015)
LAMP Progress Report (August 31, 2015)
LAMP Progress Report (September 30, 2015)
LAMP Progress Report (October 30, 2015)
LAMP Progress Report (December 31, 2015) NEW!
    Meeting Dates

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com
Orange County
Meet & Greet Presentation

Progress Report (Jan. 31, 2011)
Progress Report (Feb. 28, 2011)
Progress Report (Mar. 31, 2011)
Progress Report (May 2, 2011)
Progress Report (Jun. 1, 2011)
Progress Report (Jul. 1, 2011)
Progress Report (Aug. 1, 2011)
Progress Report (Sep. 1, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (July 31, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
Progress Report (October 30, 2015)
Progress Report (December 31, 2015) NEW!
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 08.30.12
    Appeals and Comments Period: 09.27.13 - 12.25.13

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com
Refugio County
Meet & Greet Presentation

Progress Report (Jan. 28, 2011)
Progress Report (Feb. 25, 2011)
Progress Report (Mar. 25, 2011)
Progress Report (Apr. 29, 2011)
Progress Report (May 27, 2011)
Progress Report (Jun. 29, 2011)
Progress Report (Jul. 31, 2011)
Progress Report (Aug. 31, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (July 31, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 11.01.12
    Appeals and Comments Period: 09.26.13 - 12.24.13
    LFD Date: 03.26.14
    Effective Date: 09.26.14

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com
San Patricio County
Meet & Greet Presentation

Progress Report (Jan. 31, 2011)
Progress Report (Feb. 28, 2011)
Progress Report (Mar. 31, 2011)
Progress Report (Apr. 30, 2011)
Progress Report (May 31, 2011)
Progress Report (Jun. 30, 2011)
Progress Report (Jul. 31, 2011)
Progress Report (Aug. 31, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 30, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (July 31, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
Progress Report (October 30, 2015)
Progress Report (December 31, 2015) NEW!
    Meeting Dates

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 08.29.14

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com
Victoria County
Please visit http://www.riskmap6.com/TX/Victoria/ for an interactive mapping viewer of the current Effective FIRM data compared to the recent Preliminary DFIRM data released for your county.
Preliminary Interactive Flood Map Index
Flood Insurance Study
CCO Meeting Notes (Jan. 27, 2011)
CCO Outreach (Mar. 18, 2011)

Progress Report (Jan. 28, 2011)
Progress Report (Feb. 25, 2011)
Progress Report (Mar. 25, 2011)
Progress Report (Apr. 29, 2011)
Progress Report (May 27, 2011)
Progress Report (Jun. 30, 2011)
Progress Report (Jul. 29, 2011)
Progress Report (Aug. 26, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (July 31, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
Progress Report (October 30, 2015)
Progress Report (December 31, 2015) NEW!

LAMP Progress Report (Nov. 30, 2013)
LAMP Progress Report (Dec. 31, 2013)
LAMP Progress Report (Jan. 31, 2014)
LAMP Progress Report (Feb. 28, 2014)
LAMP Progress Report (Mar. 31, 2014)
LAMP Progress Report (Apr. 30, 2014)
LAMP Progress Report (May 31, 2014)
LAMP Progress Report (Jun. 30, 2014)
LAMP Progress Report (Jul. 31, 2014)
LAMP Progress Report (Aug. 31, 2014)
LAMP Progress Report (Sep. 30, 2014)
LAMP Progress Report (Oct. 31, 2014)
LAMP Progress Report (Nov. 30, 2014)
LAMP Progress Report (Dec. 31, 2014)
LAMP Progress Report (Jan. 31, 2015)
LAMP Progress Report (Feb. 28, 2015)
LAMP Progress Report (Mar. 31, 2015)
LAMP Progress Report (Apr. 30, 2015)
LAMP Progress Report (May 31, 2015)
    Meeting Dates
    Kickoff Meeting: 01.01.06
    Community Consultation Officers (CCO) Meeting: 01.27.11

    Digital Flood Insurance Rate Map (DFIRM) Dates
    Preliminary Flood Map Release: 11.22.10

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Willacy County
Meet & Greet Presentation

Progress Report (Jan. 31, 2011)
Progress Report (Feb. 28, 2011)
Progress Report (Mar. 31, 2011)
Progress Report (Apr. 30, 2011)
Progress Report (May 31, 2011)
Progress Report (Jun. 30, 2011)
Progress Report (Jul. 31, 2011)
Progress Report (Aug. 31, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Feb. 29, 2012)
Progress Report (Mar. 31, 2012)
Progress Report (Apr. 30, 2012)
Progress Report (May 31, 2012)
Progress Report (Jun. 30, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Feb. 28, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (July 31, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
Progress Report (October 30, 2015)
Progress Report (December 31, 2015) NEW!
    Meeting Dates

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com
Risk MAP Watershed Projects

Austin-Travis Lakes Watershed
This watershed's geographic extent is made up of portions of Blanco, Burnet, Hays, Llano, Travis, and Williamson, Texas.
    Meeting Dates
    Discovery Meeting: 03.06.13 @ 9 a.m
    Discovery Meeting: 03.07.13 @ 9 a.m

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com


Bois D'Arc-Island Watershed
This watershed’s geographic extent is made up of portions of Bryan and Choctaw Counties, Oklahoma and Fannin, Grayson, Lamar, and Red River Counties, Texas.
    Meeting Dates
    Discovery Meeting:

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Elm Fork Trinity Watershed
This watershed’s geographic extent is made up of portions of Collin, Cooke, Dallas, Denton, Grayson, Montague, Tarrant, and Wise Counties, Texas.
    Meeting Dates
    Discovery Meeting: 05.28.13 @ 9 a.m
    Discovery Meeting: 06.25.13 @ 9 a.m

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Lower Brazos Watershed
This watershed’s geographic extent is made up of portions of Collin, Cooke, Dallas, Denton, Grayson, Montague, Tarrant, and Wise Counties, Texas.
    Meeting Dates
    Discovery Meeting:

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

LOWER SABINE Watershed
This watershed's geographic extent is made up of portions of Beauregard, Calcasieu, Cameron, Sabine and Vernon Parishes, Louisiana; and Jasper, Newton, and Orange Counties, Texas.
    Meeting Dates

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Lower Trinity Watershed
This watershed’s geographic extent is made up of portions of Liberty, Chambers, and San Jacinto, Texas.
Region 6 - Fact Sheets
Pre-Discovery Newsletter
Discovery Meeting Minutes
Understanding Risk MAP

Progress Report (Jun. 30, 2011)
Progress Report (Jul. 31, 2011)
Progress Report (Sep. 2, 2011)
Progress Report (Sep. 30, 2011)
Progress Report (Oct. 31, 2011)
Progress Report (Nov. 30, 2011)
Progress Report (Dec. 31, 2011)
Progress Report (Jan. 31, 2012)
Progress Report (Jul. 31, 2012)
Progress Report (Aug. 31, 2012)
Progress Report (Sep. 30, 2012)
Progress Report (Oct. 31, 2012)
Progress Report (Nov. 30, 2012)
Progress Report (Dec. 31, 2012)
Progress Report (Jan. 31, 2013)
Progress Report (Jan. 31, 2013)
Progress Report (Mar. 31, 2013)
Progress Report (Apr. 30, 2013)
Progress Report (May 31, 2013)
Progress Report (Jun. 30, 2013)
Progress Report (Jul. 31, 2013)
Progress Report (Aug. 31, 2013)
Progress Report (Sep. 30, 2013)
Progress Report (Oct. 31, 2013)
Progress Report (Nov. 30, 2013)
Progress Report (Dec. 31, 2013)
Progress Report (Jan. 31, 2014)
Progress Report (Feb. 28, 2014)
Progress Report (Mar. 31, 2014)
Progress Report (Apr. 30, 2014)
Progress Report (May 31, 2014)
Progress Report (Jun. 30, 2014)
Progress Report (Jul. 31, 2014)
Progress Report (Aug. 31, 2014)
Progress Report (Sep. 30, 2014)
Progress Report (Oct. 31, 2014)
Progress Report (Nov. 30, 2014)
Progress Report (Dec. 31, 2014)
Progress Report (Jan. 31, 2015)
Progress Report (Feb. 28, 2015)
Progress Report (Mar. 31, 2015)
Progress Report (Apr. 30, 2015)
Progress Report (May 31, 2015)
Progress Report (June 30, 2015)
Progress Report (July 31, 2015)
Progress Report (August 31, 2015)
Progress Report (September 30, 2015)
Progress Report (October 30, 2015)
Progress Report (December 31, 2015)NEW!
    Meeting Dates
    Discovery Meeting: 08.10.11 @ 9 a.m.
    Discovery Meeting: 08.10.11 @ 1:30 p.m.

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Lower West Fork Trinity Watershed
This watershed’s geographic extent is made up of portions of Dallas, Ellis, Hood, Johnson, Parker, and Tarrant Counties, Texas.
    Meeting Dates
    Discovery Meeting: 05.29.13 @ 9 a.m
    Discovery Meeting: 06.26.13 @ 9 a.m

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Middle Brazos-Palo Pinto Watershed
This watershed's geographic extent is made up of portions of Archer, Eastland, Erath, Hood, Jack, Johnson, Palo Pinto, Parker, Somervell, Stephens, and Young Counties, Texas.
    Meeting Dates

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Middle Brazos-Lake Whitney Watershed
This watershed's geographic extent is made up of portions of Bosque, Erath, Falls, Hill, Hood, Johnson, Limestone, McLennan, and Somervell Counties, Texas.
    Meeting Dates

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Rio Grande-Fort Quitman Watershed
This watershed's geographic extent is made up of portions of El Paso and Hudspeth Counties, Texas.
    Meeting Dates

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

San Gabriel Watershed
This watershed’s geographic extent is made up of portions of Bell, Burnet, Milam, and Williamson Counties, Texas.
    Meeting Dates

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Upper Clear Fork Brazos Watershed
This watershed's geographic extent is made up of portions of Callahan, Fisher, Haskell, Jones, Nolan, Scurry, Shackelford, Taylor, and Throckmorton Counties, Texas.
    Meeting Dates

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

Upper Trinity Watershed
This watershed’s geographic extent is made up of portions of Anderson, Collin, Dallas, Ellis, Freestone, Henderson, Kaufman, and Navarro Counties, Texas.
    Meeting Dates
    Discovery Meeting: 05.30.13 @ 1:30 p.m
    Discovery Meeting: 06.27.13 @ 9 a.m

    Mapping Partner Contact
    Philip Drazek, PE, CFM
    URS - A RAMPP JV Partner
    One Park Square
    6501 Americas Parkway, NE
    Suite 900
    Albuquerque, NM 87110
    Direct: 505-855-7415
    Phil.Drazek@URS.com

FEMA Region 6
Texas

Visit Region VI Fact Sheets for more information about the Region VI mapping process and community responsibilities for receiving comments & appeals; adopting floodplain management ordinances; and communicating insurance requirements to local residents.